tob

Concert Hall · Remodeling

KBS Hall

KBS Hall in Yeouido hosts classical concerts, amplified shows and broadcast production in one space. Precise measurement revealed the causes of its echoes, and the architectural acoustic design that followed was verified by measurement after completion.

Use
Concert hall and broadcast production venue
Client
KBS (Korean Broadcasting System)
Location
Yeouido, Seoul, Korea
Year
2014
Role
Measurement and problem analysis of the existing hall, architectural acoustic design, site inspection and post-completion measurement
Status
Completed
KBS Hall seen from the stage, with timber side walls, balconies and the audience
KBS Hall after the remodeling

Before and after

The side walls and balconies, before and after the remodeling.

Side wall of KBS Hall before the remodeling, with flat dark panels and plain balcony frontsBefore
Flat wall panels and balcony fronts
Side wall of KBS Hall after the remodeling, with variable acoustic banners and shaped balcony frontsAfter
Variable acoustic banners and angled, stepped side-wall structure
Balcony undersides before the remodeling with flat timber surfacesBefore
Smooth balcony undersides
Balcony fronts after the remodeling covered with micro-shaped timber battensAfter
Balcony front with micro-shaped structure

The challenge

KBS Hall’s basic acoustic qualities, including its volume, reverberation and clarity, were sound. Over its first 25 years, however, high-powered, highly directional loudspeaker systems used in a wide range of performances caused problems on the stage and in the seating.

The flat side walls and balcony fronts returned strong echoes to the stage, and the steel ribs on the rear walls resonated under amplified bass. Reflections from the walls beside the main loudspeakers caused phase interference in the balcony seats. The aim was to control these problems while keeping the good acoustic qualities the hall already had.

What was done

First, the existing conditions of the hall were measured under four conditions. The sources were an omnidirectional source with and without the orchestra shell, the hall’s own main loudspeakers, and a directional source on stage representing a singer or soloist. Omnidirectional and figure-of-eight microphones were used together to analyze the direction and path of each echo and to identify the surfaces producing unwanted reflections.

Based on this, a finish structure was designed and applied to each problem surface. After completion, the hall was measured again under the same conditions to confirm that the echoes had been resolved and that the original reverberation and clarity had been kept.

Measure, improve, verify

A multi-purpose hall cannot be perfect for every use.
So the design controlled the problems that affect a wide range of performances, while keeping the hall’s already good reverberation and clarity.

Step 1

Identifying the surfaces behind the echoes

Standard measurements cannot show where an echo comes from. Measuring with omnidirectional and figure-of-eight microphones together showed that the side walls and balcony fronts sent strong reflections, arriving later than the direct sound, back to the stage, and that the walls beside the main loudspeakers caused phase interference in the balcony seats. Before the design began, precise measurement identified every surface that was causing a problem.

Plans of the hall showing echo paths from balcony fronts and side walls, with the impulse responses measured before the remodeling
Diagnosis before the remodeling: echo paths and impulse responses

Step 2

Finish design for the main reflecting surfaces

The angled, stepped side-wall structure was adjusted in angle and given additional dense diffusing surfaces. The balcony fronts and soffits were given micro-shaped timber to diffuse reflections and add intimacy, and the steel ribs on the rear walls, which had resonated, were replaced with composite absorbers.
The variable acoustic banners beside the loudspeakers are lowered for amplified shows to reduce reverberation and control unwanted reflections, and raised for classical concerts.

Variable acoustic banners lowered from a slot beside the side wall
Variable acoustic banners beside the main loudspeaker
Underside of a balcony covered with micro-shaped timber battens
Micro-shaped balcony front
Rear wall finished with curving timber louvers over absorption
Composite absorber on the rear wall

Step 3

Verification by post-completion measurement

After completion, the hall was measured again with the same sources at the same positions, and the impulse responses before and after the remodeling were compared. The strong late reflections that had returned to the stage and the seating were resolved, the early reflections arrived in a regular sequence along the time axis, and no resonance was observed under the balconies.
With the variable acoustic banners, the reverberation time can now be adjusted for classical concerts and amplified shows, and the hall’s already good reverberation and clarity were kept.

Plans of the hall with sound paths, and impulse responses measured before and after the remodeling for three sound sources
Impulse responses before and after the remodeling for three sound sources

What mattered

  1. Analysis and design based on measurement

    Precise measurement identified the surfaces causing the echoes, so that the resulting design answers measured problems rather than guesses.

  2. Preserving the existing acoustic qualities

    The hall’s volume, reverberation and clarity were already good. Improvements were applied only to the surfaces causing problems, so that these qualities were kept.

  3. Concerts, amplified shows and broadcasts together

    Variable acoustic banners and diffusing surfaces let the same room accommodate classical concerts, high-powered amplified shows and broadcast production.

The remodeled hall

Related projects

  • Measurements, acoustic studies and diagrams: Jeon Hyunjoon
Start a conversation