A 1:10 scale model of the hall was built and tested to find acoustic problems before construction began. The model work was carried out by Jeon Hyunjoon; the lead acoustic consultant was Nagata Acoustics.

Architect
Designcamp Moonpark dmp
Lead acoustic consultant
Nagata Acoustics (Japan)
Client
Lotte Engineering & Construction
Location
Seoul, Korea
Years
2012–2013
Role
1:10 scale model making and testing, then technical adviser on architectural acoustics with Nagata Acoustics
Status
Completed
A seated figure in the 1:10 scale model of the Lotte World Tower Concert Hall
A seated figure in the 1:10 scale model, before the surface diffusing treatment

The challenge

Because the hall is dedicated to classical music, it was important to achieve an even distribution and tendency of early reflections across all the audience areas.

To verify the design reliably, an accurately built 1:10 scale model had to be tested, which called for precise model making and demanding test conditions.

What was done

A model of the hall was built at one-tenth of its actual size to see how sound moves in it, and the problems found before construction were reflected in the design.

The model was made from MDF cut by CNC. After its architectural geometry was checked and corrected, measurement microphones were installed and the model was filled with nitrogen. Diffusing structures were then applied, and the main acoustic parameters were measured again.

During construction, Jeon Hyunjoon provided technical advice on architectural acoustics together with Nagata Acoustics, the lead acoustic consultant.

From making to the final model

The 1:10 model was developed in three steps, from making to measurement.

Step 1

Making

Based on the design drawings, the model frame and interior surfaces were built from MDF cut by CNC.

Model frame in the workshop
Model frame in the workshop
Ceiling reflectors and balcony terraces
Ceiling reflectors and balcony terraces

Step 2

Applying diffusing structures

After the basic form was built, diffusing structures reflecting the interior design were applied and the experiments were carried out. For every experiment, measurement microphones were installed and the nitrogen fill was verified.

Interior wall and balcony fronts
Interior wall and balcony fronts
Seating terraces and balcony walls
Seating terraces and balcony walls

Step 3

Final model

To measure the acoustics with an audience seated, figure models were placed in the seats and the main acoustic parameters were measured.

Seating blocks and balconies
Seating blocks and balconies
Full view of the final model
Full view of the final model

What mattered

  1. Design tested before it is built

    Problems found through the 1:10 scale model experiments before actual construction were reflected in the design.

  2. Controlling echoes and similar defects

    The angles of the balcony fronts and of the ceiling lighting rooms were adjusted so that acoustic defects such as echoes would not occur.

  3. Early reflections suited to classical music

    The design proceeded with model experiments to confirm that early reflections are evenly distributed.

Film: Making the 1:10 scale model of the Lotte World Tower Concert Hall

Related projects

  • Architect: Designcamp Moonpark dmp
  • Client: Lotte Engineering & Construction
  • Lead acoustic consultant: Nagata Acoustics (Japan)
  • Architectural acoustic consultant: Jeon Hyunjoon (1:10 scale model making and testing; technical advice during construction)