Performing Arts Center · Remodeling
Incheon Culture & Arts Center
Architectural acoustics for the remodeling of the 1,332-seat main hall and the rehearsal rooms of the resident companies, from master plan and feasibility study to construction documents.
- Use
- Main hall, and five rehearsal rooms for four resident companies
- Client
- Incheon Metropolitan City
- Location
- Incheon, Korea
- Years
- 2020–2023
- Role
- General lead consultant, architectural acoustics: master plan and feasibility study, design competition, basic design and construction documents
- Status
- Completed (reopened October 2025)

The challenge
The main hall serves orchestral concerts, opera, musicals and amplified shows. Its balance across the frequency bands did not suit this multi-purpose use: vibration of the lightweight ceiling absorbed the bass, so the sound was thin and harsh.
Acoustic conditions were uneven between levels and seats, and the forestage and orchestra pit lacked early reflections. The loudspeakers beside the proscenium partly blocked the audience's view of the stage.
What was done
Jeon Hyunjoon led the architectural acoustics through the master plan and feasibility study, the design competition, and basic design and construction documents. The main hall and five rehearsal rooms were measured to analyze their problems, acoustic targets were set from comparable remodeled halls and consultation with the users, and the interior design and finishes were finalized on that basis.
The forms and angles of the side walls and ceiling reflectors were optimized by ray tracing, and the main hall and rehearsal rooms were verified in CATT-Acoustic. Wall lines were adjusted to the new loudspeaker system and lighting plan, and the acoustic finishes and details were specified for construction.
From measurement to design, from lines to surfaces
Problems were found by measurement, and their solutions were applied to the key elements of the main hall and rehearsal rooms and verified as the design progressed.
Step 1
Measuring and diagnosing the existing hall
Key architectural acoustic parameters were measured at 36 seats. Vibration of the lightweight ceiling absorbed low-frequency energy, giving a frequency response unsuited to unamplified performances such as classical concerts. The different wall finishes of the first level (absorptive) and the second level (diffusing and reflective) made the two levels sound different, and the forestage and orchestra pit lacked useful reflections.

Step 2
Assigning a function to each key element
The acoustic character and function of each surface were defined and its finish chosen. Reflecting surfaces use curved formed board with enough surface mass not to vibrate, absorbing and diffusing surfaces use rib systems and fabric, and excess bass is controlled by perforated soffits under the balconies. The forms and angles of the side walls and the two rows of ceiling reflectors were optimized by ray tracing.



Step 3
Verification by 3D modeling and simulation
The 3D model reproduced the interior design lines and the acoustic finishes of each element in detail, and acoustic simulation verified the design targets.
Mid-frequency reverberation was kept at its original level while the bass was lengthened and the treble shortened to balance the frequency bands, and clarity, lateral energy fraction and strength were checked with and without the orchestra shell.

Step 4
Rehearsal spaces for each resident company
The five existing rehearsal rooms had short reverberation, weak bass, echoes and noise passing between rooms. Target reverberation times were set for each company's use and rehearsal practice. The orchestra room gained ensemble conditions through surface mass, diffusing finishes and reconfigured risers, and the choir room gained clarity through diffusing walls and an absorptive ceiling. The theater and dance rooms received rib systems designed with amplification in mind and sprung floors, and every room has sound-insulating walls and ceilings and double sound-lock doors to stop noise transmission.


Key points
From first to last
The design targets set in the master plan and feasibility study were carried through the design competition to construction documents without wavering, growing more detailed at each stage, with one consultant leading the whole process.
Beyond the average
Instead of a single number for average reverberation time, the design balanced the frequency bands and reduced the differences between levels, aiming for even sound in every seat.
From the stage to the rehearsal room
Beyond the main hall, the five rehearsal rooms of the four resident companies were designed together, so that every space for performance and rehearsal has the acoustics it needs.
Related projects
- Client: Incheon Metropolitan City
- Architectural acoustic consultant: Jeon Hyunjoon (general lead, master plan and feasibility study through construction documents)
- Measurements and acoustic studies: Jeon Hyunjoon