tob

Performing Arts Center

LG Arts Center Seoul

Technical adviser on architectural acoustics through design and construction for the performing arts center designed by Tadao Ando, with Theatre Projects (UK) as the lead acoustic consultant.

Architect
Tadao Ando Architect & Associates, Gansam
Lead acoustic consultant
Theatre Projects (UK)
Client
LG, GS E&C
Location
Magok, Seoul, Korea
Years
2018–2020
Role
Technical adviser on architectural acoustics, design and construction stages
Status
Completed (opened October 2022)
The LG SIGNATURE Hall, the main hall of LG Arts Center Seoul, with wooden rib walls and two balconies
The main hall, LG SIGNATURE Hall. Photo: LG Arts Center

The challenge

The main hall has to serve orchestras, opera, musicals and amplified touring shows, so its reverberation must be adjustable for each kind of performance.

The black box (120 to 365 seats) rearranges its stage and seating for each production, yet needs stable acoustics in every layout.

Both halls must be isolated from external noise and vibration, so that they can be used at the same time and keep the required quietness.

What was done

In the design stage, we reviewed whether the acoustic design by Theatre Projects was carried faithfully into the construction documents of the local design team. The review covered the room shapes and interior finishes of both halls, the variable acoustic absorption system (VABS), the orchestra shell, and the noise and vibration isolation plan, including structural separation, vibration isolation and building services noise. Where the drawings needed clarification, we confirmed the design intent through formal RFIs (requests for information) and proposed alternatives that balanced buildability with acoustic performance.

In the construction stage, we reviewed acoustic shop drawings, finishing materials and mock-ups and inspected the site, so that the design intent was realized in the completed halls.

From design documents to site

The drawings and specifications were checked closely against the requirements of Theatre Projects, and during construction alternatives were proposed in response to site requirements.

Step 1

Reviewing the variable acoustic absorption system (VABS)

The variable absorption of the main hall relies on curtains driven within a narrow cavity behind the side-wall ribs, a space shared with surround and embedded loudspeakers. The cavity was coordinated across stage engineering, interiors and sound systems, and checked against the curtain-to-wall offset assumed in the acoustic simulation. To meet the design goals, RFIs were prepared that compared the design with the specification criteria, so that the requirements were carried through construction without problems.

Absorption curtains folded in a wall cavity, the cavity behind them, and the wooden wall ribs in front
Variable absorption curtains and the wall ribs in front of them, surveyed at the existing LG Arts Center in Yeoksam

Step 2

Reviewing the main architectural acoustic finishes

The main acoustic finishes listed in the drawings and specifications were checked one by one against the requirements of Theatre Projects and the test certificates of each product. The review confirmed whether the acoustic properties of the materials met the requirements, whether the materials were named consistently across documents, and whether the absorber build-ups matched the conditions under which they had been tested, and any discrepancy was resolved with a proposal for a corrected specification and detail.

Six photos of acoustic finishes: fabric behind wall ribs, a loudspeaker in the stage front, seats, orchestra pit drapes, stage wall panels and a stage wall behind rigging
Main acoustic finishes checked on site: (a) sound-transparent fabric behind the wall ribs, (b) a loudspeaker built into the stage front, (c) seat upholstery, (d) orchestra pit drapes, (e, f) stage wall finishes
Three wall sections comparing the specified stage wall absorber, a panel as tested with an air gap, and the same panel as detailed without an air gap
Absorber build-ups: the stage wall as specified, and the follow-spot room panel as tested (with air gap) and as detailed (without air gap)
Chart comparing the required absorption of the orchestra pit wall panels with the panel specified in the interior documents
Orchestra pit wall panels: absorption of the design documents compared with the required criteria

Step 3

Securing quietness in the halls

The paths through which noise could enter the halls were reviewed one by one: the wire rope openings between the stage machinery rooms and the stage, duct and pipe penetrations, follow-spot room windows, and the absorptive finishes of the fly tower and scene dock. Completed Korean venues were surveyed on site to compare what worked and what did not, and on that basis attenuators at openings, sealed penetrations and double-glazed windows that can be maintained were proposed.

Six site photos of wire rope openings above a stage, a follow-spot room window and duct and pipe penetrations through walls
Site survey of completed Korean venues: wire rope openings, a follow-spot room window and duct and pipe penetrations

What mattered

  1. Delivering the design goals of Theatre Projects

    The acoustic design goals of Theatre Projects were carried through Korean design and construction, from drawing review to site inspection.

  2. Securing VABS performance for varied programs

    The architectural and interior conditions and the curtain system were reviewed so that the VABS curtains can create a reverberation environment optimized for orchestra, opera and amplified performances.

  3. Reviewing the box-in-box structure for quietness

    The box-in-box structure, which isolates sound with concrete, an air gap and absorption and separates the structures, was reviewed to confirm that it was realized as designed in the drawings and in construction.

The completed center

Related projects

  • Architect: Tadao Ando Architect & Associates, Gansam
  • Client: LG, GS E&C
  • Lead acoustic consultant: Theatre Projects (UK)
  • Architectural acoustic technical adviser: Jeon Hyunjoon (design and construction stages)
  • Photographs: LG Arts Center (main hall, recital, black box, grid and rehearsal room, and the video still)
  • Acoustic studies: Jeon Hyunjoon
Start a conversation